Commercial Solar Decommissioning + Recycling

Remove It Clean. Restore What Comes Next.

CRG Devco handles commercial solar removal, recycling, transport and documentation for roof replacement, redevelopment and safe site restoration.

From rooftop arrays to ground-mount systems, we coordinate the work around your facility, roofer, GC and next project milestone.

Full-System RemovalModules, racking, wiring and inverters.
Roof ProtectionSafe access and coordinated lift plans.
Recycling + SalvageRecover usable value where possible.
Documented CloseoutPhotos, manifests and certificates.

Decommissioning is not just taking panels off a roof. It is preparing the asset for what happens next.

A Controlled Transition

CRG Devco delivers commercial solar decommissioning with a clear sequence: plan the removal, protect the site, move the equipment, document the chain of custody and leave the property ready for roofing, redevelopment or a new energy system.

We coordinate with facility operations, roofing contractors, construction teams and equipment owners so the removal does not become the reason the next project stalls.

Rooftop + ground-mount systems
Roof replacement coordination
Photo and manifest tracking
Recycling, resale and disposal paths
What We Handle

One Scope. One Accountable Team.

Every removal is planned around the equipment, the property and the next use of the site.

01 / REMOVE

System Removal + Dismantling

Remove modules, racking, ballast, wiring, conduits, disconnects, inverters and balance-of-system components using controlled procedures.

02 / PROTECT

Roof-Ready Cleanup

Clear attachments, rails, ballast and debris so the roof is ready for inspection, repair, replacement or redevelopment.

03 / RECOVER

Recycling + Salvage

Separate usable equipment and recyclable materials to reduce disposal exposure and preserve salvage value where practical.

04 / DOCUMENT

Transport + Records

Coordinate transport and provide photo logs, equipment counts, manifests and recycling or disposal documentation.

Built Around the Next Milestone

Clear the Site Without Losing Control of the Project.

Whether the array is coming off for a roof replacement, a property sale, an upgrade or full retirement, CRG keeps the scope connected to the decision that follows.

Coordinate with your roofer, GC and facility team.
Protect the roof, site access and active operations.
Return the property clean, documented and ready.
The CRG Process

Predictable Work From First Walkthrough to Final Certificate.

01 / REVIEW

Understand the site.

Confirm system type, access, roof conditions, operating constraints and the next project deadline.

02 / PLAN

Define the removal.

Set the sequence, equipment, safety controls, responsibilities and documentation requirements.

03 / EXECUTE

Remove and move.

Disassemble, transport, separate and track the system components with active site coordination.

04 / CLOSE

Leave the record.

Deliver a clean site with photo documentation, counts, manifests and recycling or disposal records.

Decommissioning FAQ

The Questions Property Owners Ask First.

Clear answers before a removal affects the roof, schedule or next phase.

Do you remove the entire commercial solar system?

Yes. CRG can coordinate removal of modules, racking, ballast, wiring, conduits, disconnects, inverters and related balance-of-system equipment.

Can you remove solar panels before a roof replacement?

Yes. We coordinate with the roofing contractor and facility team to clear the roof safely, protect the work area and keep the reroofing schedule moving.

Do you buy or recycle old commercial solar panels?

We evaluate used, damaged and end-of-life equipment for resale, reuse, recycling or documented disposal based on condition, location and marketability.

What documentation do we receive?

Documentation can include photos, equipment counts, transport records, manifests, recycling certificates and a final site-condition report.

Can the system be reinstalled after the roof is replaced?

Yes. CRG can coordinate reinstallation or connect the project to a new commercial solar EPC scope after the roof work and approvals are complete.

Ready for a Clean Handoff?

Tell Us What Has to Come Off—and What Happens Next.

Share the property, system type, roof or redevelopment timeline and immediate constraint. CRG will identify the most practical removal path.

Start a Removal Conversation →